Preparations before starting up
The raw materials should meet the required
drying requirements, and the raw materials should be screened to remove
agglomerates and mechanical impurities. Check whether the water, electricity,
and gas systems in the equipment are normal, ensure that the water and gas
lines are smooth and leak-proof, whether the electrical system is normal,
whether the heating system, temperature control, and various instruments are
working reliably; test run the auxiliary engine empty and at low speed, and
observe Check whether the equipment is operating normally; start the vacuum
pump of the setting table and observe whether it works normally; add oil to
lubricate the lubricating parts of various equipment. If any fault is found,
eliminate it promptly.